- Written by Super User
- Category: Uncategorised
- Hits: 0
Documents
https://www.azhk.kz/ru/corporate-governance/documents
Regulatory and Legal Framework
Law on Natural Monopolies |
Law on the National Welfare Fund |
Law on Joint Stock Companies |
Law on Electric Power Industry |
On the Approval of the Technical Regulation General Requirements for Fire Safety |
On the Approval of the Rules for the Use of Electric Energy |
On the Approval of the Rules for the Provision of Utility Services in the Almaty City |
On the Approval of the Rules for Establishing Protection Zones of Electrical Network Facilities |
On Energy Saving and Increasing Energy Efficiency |
Cost Estimate of "AZhC" JSC for the Installation of an Individual Electric Energy Meter for Consumers in the Almaty City and Almaty Region |
A Guide for Employees Facing Harassment at Work |
https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2856-korporativnye-dokumenty
Corporate Documentsэ
Founding Documents
Charter of "AZhC" JSC |
Trademark Certificate |
Codes
Code of Conduct of "AZhC" | JSC Corporate Governance Code |
Policies and Regulations
Internal Control Process Regulation of «AZhC» JSC |
Dividend Policy of "Samruk-Energy" JSC |
Information Policy of «AZhC» JSC |
HR Policy of «AZHC» JSC |
Policy on Corporate Conflict Resolution and Conflict of Interest |
CMS Policy of the Samruk-Energy Group of Companies |
Provisions and Rules
Regulation on the Board of Directors of «AZhC» JSC |
Regulation on the Board Members of «AZhC» JSC |
Rules for Planning, Coordination, and Making Payments in "Samruk-Energy" JSC |
Corporate Calendars
Corporate Events Calendar for 2022 |
Corporate Events Calendar for 2021 |
Annual Reports
Annual Report for 2021 |
Annual Report for 2020 |
https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2857-sistema-upravleniya-riskami
Risk Management System
Risk Management Policy of “Alatau Zharyk Company” JSC |
Rules for Risk Identification and Assessment of “Alatau Zharyk Company” JSC (Supplement) |
https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2858-finansovaya-otchetnost
Financial Statements
Financial Statements as of 30.09.2023 |
Financial Statements as of 30.06.2023 |
Financial Statements as of 31.03.2023 |
Excerpt from Protocol №02-23 dated 31.03, Report on FEA for the 2022 |
Excerpt from Protocol №04-23 dated 6.06.2023 (Report on FEA for 1st quarter 2023) |
Protocol №07-22 dated 23.11.2022 (FEA for 9 months) |
FEA for 1st quarter 2022. Protocol №05-22 dated 30.06.2022 |
FEA for the first half of 2022. Protocol No. 06-22 dated 27.08. 2022 |
Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Report as of 31.12.2022 |
Financial Statements as of 31.12.2022 |
Financial Statements as of 30.09.2022 |
Financial Statements as of 30.06.2022 |
Financial Statements as of 31.03.2022 |
Excerpt from Protocol №17 dated 17.05.2022 |
Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Report as of 31.12. 2021 |
Excerpt from Protocol №10 dated 31.12.2021 |
Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2020 |
Excerpt from Protocol №11 dated 6.05.2020 |
Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2019 |
Excerpt from Protocol №19 dated 27.06.2019 |
Excerpt from Protocol №15 dated 24.05.2019 |
Excerpt from Protocol №6 dated 23.04.2018 |
Condensed Interim Financial Statements (Unaudited) as of 30.06.2018 |
Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2018 |
https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2859-investitsionnaya-programma
Инвестиционная программа
Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2023 |
|||
Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2023 |
|||
Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2023 |
|||
Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2022 |
|||
Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2022 |
Transfer of loads from the existing Substations №5A, № 17A, and №132A to the newly built Substation 110/10-10kV №163A "Otrar" |
Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN |
Reconstruction of the 10/0.4 kV electrical networks of the Otegen Batyr DEN |
Construction of the Substation 110/10kV "Kokozek" with connection to the Open switchgear-110kV Substation-220kV "Kaskelen" in the Karasai district of the Almaty region |
|
|
|
Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2022
|
Transfer of loads from the existing Substations №5A, № 17A, and №132A to the newly built Substation 110/10-10kV "Otrar" |
Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply |
Reconstruction and new construction of 10-6-0.4kVelectrical networks at DEN-4, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply |
Construction of the Substation 110/10kV "Kokozek" with connection to the 110kV Switchgear of the Substation 220kV "Kaskelen" in the Karasai district of the Almaty region |
|
|
|
Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2022
|
Reconstruction of the 10/0.4kV electrical networks of the "Otegen Batyr" DEN, Reconstruction of the 6-10/0.4kV electrical networks of the Talgar DEN, Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN |
Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply
|
Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-4, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply
|
Transfer of loads from the existing Substation № 4 to the newly built Substation 110/10-10kV "Alatau" |
|
|
|
Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2021 |
Load transfer from Substation № 19A to the newly built Substation "Mamyr"
|
Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168A). Phase 1
|
Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar" |
Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to enhance the reliability of the power supply |
Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-4, replacing overloaded and end-of-life cable lines to enhance the reliability of the power supply |
"Reconstruction of the 10/0.4kV electrical networks of the “Otegen Batyr” DEN", "Reconstruction of the 6-10/0.4kV electrical networks of the Talgar DEN", "Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN" |
Construction of the Substation 110/10kV "Kokozek" with connection to the Open Switchgear 110kV of the Substation 220kV "Kaskelen" in the Karasai district of the Almaty region |
Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2021 |
"Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №. 168). Phase 1". |
"Construction of the Substation 110/10kV 'Kokozek' with connection to the Open Switchgear 110kV of the Substation 220kV 'Kaskelen' in the Karasai district of the Almaty region". |
"Conversion of existing 6kV networks of Substations №6A 22A, 50A, 54A, 100A to 10kV voltage from the power lines-10kV of Substation №6A 150A 'Almaly' and from the newly built Substations 'Medeu' and 'Shymbulak'". |
"Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV №163A 'Otrar'". |
|||
Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2021 |
Conversion of existing 6kV networks of Substations №22A, 50A, 100A, 54A to 10kV voltage from the power lines-10kV of Substation №150A "Almaly" and from the newly built Substations "Medeu" and "Shymbulak" |
Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1 |
Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-6 |
Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2021
|
Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1 |
Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-6 |
|
Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2020
|
Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168). Phase 1 |
Conversion of existing 6kV networks of Substations № 22, №50, №54, №100 to 10kV voltage from the power lines-10kV of Substation №150A Almaly and from the newly built Substations Medeu and Shymbulak |
Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of 110kV overhead line №120AI at Substation 220kV Besagash |
"Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-1, DEN-6. Replacement of overloaded and end-of-life cable lines" |
Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV |
||
Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2020 |
Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168) |
Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar" |
Reconstruction of 110kV overhead lines №102A№105A, №109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220/110/10kV №166A "Besagash" |
Load transfer from Substation №19A to the newly built Substation "Mamyr" |
Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV "Alatau" |
Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV |
|
Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2020 |
Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar" |
Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1 |
Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220kV "Besagash" |
Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV "Alatau" |
|||
Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2020 |
Project "Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV 'Alatau'" |
Project "Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of 110kV overhead line №120AI at Substation 220kV 'Besagash'" |
|
Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2019 |
Project "Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV 'Alatau'" |
Project "Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV 'Otrar'" |
Project "Load transfer of Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A" |
Project "Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV" |
Project "Reconstruction of 110kV overhead lines №102A, №105A, № 109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220kV 'Besagash'" |
||
Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2019 |
Project "Transfer of load from Substation №19A to the newly built Substation 'Mamyr'" |
Project "Transfer of part of the loads from the existing Substation №4 to the newly built Substation 110/10kV 'Alatau'" |
Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A" |
Project "Conversion of existing 6kV networks of Substations №22A, №50A, №54A, №100A to 10kV voltage from the power lines-10kV of Substation №150A 'Almaly' and from the newly built Substations 'Medeu' and 'Shymbulak'" |
Project "Reconstruction of electrical networks 10-0.4kV in the Almaty region with replacement of wires with SIW (self-supporting insulated wire)" |
Project "Reconstruction, new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to self-supporting insulated wire" |
|
Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2019 |
Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A" |
Project "Reconstruction and new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to SIW SIW (self-supporting insulated wire). Construction and reconstruction of existing transformer substations to relieve overloaded transformer substations. Reconstruction of transformer substations that do not meet operational requirements 6-10/0.4kV and construction of new transformer substations 6-10/0.4kV" |
|
Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2019 |
Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A" |
Project "Reconstruction and new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to SIW SIW (self-supporting insulated wire). Construction and reconstruction of existing transformer substations to relieve overloaded transformer substations. Reconstruction of transformer substations that do not meet operational requirements 6-10/0.4kV and construction of new transformer substations 6-10/0.4kV" |
|
Information on the progress of the Investment Program of AZhC JSC for 11 months of 2018 |
Information on the progress of the Investment Program of AZhC JSC for 5 months of 2018 |
Information on the progress of the Investment Program of AZhC JSC for 2018 |
Information on the progress of the Investment Program of AZhC JSC for 11 months of 2017 |
Information on the progress of the Investment Program of AZhC JSC for 5 months of 2017 |
Information on the execution of the Investment Program of AZhC JSC for 2017 |
Information on the progress of the Investment Program of AZhC JSC for 11 months of 2016 |
Information on the progress of the Investment Program of AZhC JSC for 5 months of 2016 |
Information on the progress of the Investment Program of AZhC JSC for 2016 |
https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2860-tekhnicheskie-dokumenty
Технические документы
Information on the reserve, availability of free and accessible capacities, spaces, and network bandwidths of AZhC JSC
4th quarter 2023 |
3rd quarter 2023 |
2nd quarter 2023 |
1st quarter 2023 |
4th quarter 2022 |
3rd quarter 2022 |
2nd quarter 2022 |
1st quarter 2022 |
4th quarter 2021 |
3rd quarter 2021 |
0.4 kV Winter 2021 |
1st quarter 2021 |
Information on the existing loads of 6-10/0.4kV transformer substations on the balance sheet of AZhC JSC |
4th quarter of 2020 |
3rd quarter of 2020 |
2nd quarter of 2020 |
1st quarter of 2020 |
4th quarter of 2019 |
3rd quarter of 2019 |
2nd quarter of 2019 |
1st quarter of 2019 |
4th quarter of 2018 |
3rd quarter of 2018 |
2nd quarter of 2018 |
1st quarter of 2018 |
4th quarter of 2017 |
3rd quarter of 2017 |
2nd quarter of 2017 |
1st quarter of 2017 |
2015 |
2016 |
Regional load profile for the Almaty power hub
January 2024 |
December 2023 |
November 2023 |
October 2023 |
September 2023 |
August 2023 |
July 2023 |
June 2023 |
April 2023 |
March 2023 |
February 2023 |
January 2023 |
December 2022 |
November 2022 |
October 2022 |
September 2022 |
August 2022 |
July 2022 |
June 2022 |
May 2022 |
April 2022 |
March 2022 |
February 2022 |
January 2022 |
December 2021 |
November 2021 |
October 2021 |
September 2021 |
August 2021 |
July 2021 |
June 2021 |
June 2021 |
May 2021 |
April 2021 |
March 2021 |
February 2021 |
January 2021 |
December 2020 |
November 2020 |
October 2020 |
September 2020 |
August 2020 |
July 2020 |
June 2020 |
May 2020 |
April 2020 |
March 2020 |
February 2020 |
January 2020 |
December 2019 |
November 2019 |
Network layout scheme for 35kV and above in Almaty city
Network layout scheme |
Network layout scheme |
Additional documents
TABLE of permissible loads on transformer equipment of AZhC JSC substations for 2021 in normal and emergency modes |
Table of permissible loads for 35kV and above power lines of AZhC JSC in normal and emergency modes for 2021 |
- Written by Super User
- Category: Uncategorised
- Hits: 0
"AZhK" JSC KINDLY REQUESTS PROMPT REPORTING, THROUGH A
CONVENIENT MEANS FOR YOU, OF ANY FACTS OF CORRUPTION IN THE
ACTIONS OF COMPANY EMPLOYEES
Confidentiality and anonymity are guaranteed!
Reports can be submitted by individuals in Russian, Kazakh, and English languages.
By call at 8 800 080 47 47 (Free call within the territory of Kazakhstan)
Through WhatsApp Messenger at +7 776 849 03 68
This email address is being protected from spambots. You need JavaScript enabled to view it.